Identify and meet requirements for the preservation of privacy and protection of personally identifiable information as required by applicable legislation.
Also written as A5.34, Annex A 5.34, ISO 27001:2022 A.5.34, ISO27001 A.5.34.
Privacy and protection of PII is one of 37 Organisational Controls in ISO/IEC 27001:2022 Annex A. Identify and meet requirements for the preservation of privacy and protection of personally identifiable information as required by applicable legislation. Organisational controls are judged on governance rather than tooling: an auditor wants a named owner, an approval trail, and evidence the control is exercised on a defined cadence rather than written once and filed.
When preparing your Statement of Applicability (SoA) for A.5.34, gather artefacts such as:
If you run more than one framework, the same evidence usually satisfies all of them. A.5.34 aligns with:
SOC 2: P1.1 Privacy notice, P4.1 Use limited to identified purposes, P6.1 Disclosure with consent
NIST CSF 2.0: GV.OC-03 Legal, regulatory and contractual requirements
A.5.34 consolidates the following ISO 27001:2013 control(s): A.18.1.4. If you are transitioning an existing ISMS, map your prior evidence for these to A.5.34 in your updated SoA.
See all 37 Organisational Controls →
Annex A controls are not mandatory in the abstract. Clause 6.1.3 requires you to compare your risk treatment plan against Annex A and justify, in the Statement of Applicability, any control you exclude. If your risk assessment surfaces a risk that A.5.34 addresses, excluding it needs a documented, risk-based rationale that an auditor will test.
In two passes. First design: does a documented control exist, is it owned, and does it address the risk? Then operating effectiveness: the auditor samples records from across the audit period to confirm the control actually ran. A Stage 2 audit will typically pull several samples, so evidence that only exists for the month before the audit is a common finding.
ISO 27001 sets no fixed interval — it requires review at "planned intervals" and after significant change. Annual review is the norm most certification bodies expect, with an out-of-cycle review triggered by incidents, major system changes, restructures, or new regulatory obligations. Record the review date and outcome either way; an undated control is treated as unreviewed.
A.5.34 aligns with SOC 2 P1.1, P4.1, P6.1 and NIST CSF GV.OC-03. Evidence gathered for one framework will usually satisfy the others, which is the basis for a test-once, satisfy-many control library.
A.5.34 consolidates 1 control(s) from the 2013 edition: A.18.1.4. When transitioning, re-point the existing evidence rather than rebuilding it — the underlying requirement has not changed materially.