A.7.5 A.7 · Physical Controls

A.7.5 — Protecting against physical and environmental threats

Design and implement protection against physical and environmental threats such as fire, flood, earthquake, and other natural or man-made disasters.

Also written as A7.5, Annex A 7.5, ISO 27001:2022 A.7.5, ISO27001 A.7.5.

What ISO 27001 A.7.5 requires

Protecting against physical and environmental threats is one of 14 Physical Controls in ISO/IEC 27001:2022 Annex A. Design and implement protection against physical and environmental threats such as fire, flood, earthquake, and other natural or man-made disasters. Physical controls are usually verified by walkthrough as well as by document review, so what an auditor observes on site has to match what the procedure claims — badge logs and visitor records are the standard corroboration.

Audit evidence assessors look for

When preparing your Statement of Applicability (SoA) for A.7.5, gather artefacts such as:

  • Physical risk assessment covering fire, flood, power failure
  • Fire suppression system maintenance records
  • Environmental monitoring alerts and logs (temperature, humidity)
  • Business continuity provisions for physical threats

How A.7.5 maps to SOC 2 and NIST CSF

If you run more than one framework, the same evidence usually satisfies all of them. A.7.5 aligns with:

SOC 2: A1.2 Environmental protections, backup and recovery infrastructure

NIST CSF 2.0: PR.IR-02 Protection from environmental threats

ISO 27001:2013 mapping

A.7.5 consolidates the following ISO 27001:2013 control(s): A.11.1.4. If you are transitioning an existing ISMS, map your prior evidence for these to A.7.5 in your updated SoA.

Map A.7.5 to NIST CSF & SOC 2 →
Crosswalk this control in the Control Mapper & Gap Assessment.
Document the risk →
Record treatment for gaps against A.7.5 in the Risk Register.

Related Annex A controls

A.7.8 Equipment siting and protection A.7.11 Supporting utilities A.7.12 Cabling security A.5.29 Information security during disruption A.5.30 ICT readiness for business continuity A.7.13 Equipment maintenance

See all 14 Physical Controls →

Frequently asked questions

Is ISO 27001 A.7.5 mandatory?

Annex A controls are not mandatory in the abstract. Clause 6.1.3 requires you to compare your risk treatment plan against Annex A and justify, in the Statement of Applicability, any control you exclude. If your risk assessment surfaces a risk that A.7.5 addresses, excluding it needs a documented, risk-based rationale that an auditor will test.

How do auditors test ISO 27001 A.7.5?

In two passes. First design: does a documented control exist, is it owned, and does it address the risk? Then operating effectiveness: the auditor samples records from across the audit period to confirm the control actually ran. A Stage 2 audit will typically pull several samples, so evidence that only exists for the month before the audit is a common finding.

How often should A.7.5 be reviewed?

ISO 27001 sets no fixed interval — it requires review at "planned intervals" and after significant change. Annual review is the norm most certification bodies expect, with an out-of-cycle review triggered by incidents, major system changes, restructures, or new regulatory obligations. Record the review date and outcome either way; an undated control is treated as unreviewed.

What does ISO 27001 A.7.5 map to in SOC 2 and NIST CSF?

A.7.5 aligns with SOC 2 A1.2 and NIST CSF PR.IR-02. Evidence gathered for one framework will usually satisfy the others, which is the basis for a test-once, satisfy-many control library.

What was A.7.5 in ISO 27001:2013?

A.7.5 consolidates 1 control(s) from the 2013 edition: A.11.1.4. When transitioning, re-point the existing evidence rather than rebuilding it — the underlying requirement has not changed materially.